We scraped off the top surface and treated this tired and pot holed driveway with a weed and moss killer. Then we applied and levelled an 804 sub base which we rolled until consolidated Next we laid a 7/4 pressed kerb bedded in a lay mix cement and backed up.
Then we supplied and laid a 10mm S.M.A tarmac which we carefully rolled in until consolidated to finish the driveway.
Croughwell Co.Galway